In 2005, Fink Engineering installed the first of its North American Double Lock chambers into the Toronto General Hospital’s new hyperbaric area. The hyperbaric area is located on the ground floor of the Eaton Wing of the hospital and has been fully fitted out to accommodate not only the patients for the Double Lock but also for the TGH’s two active monoplace chambers.
Fink Engineering’s installation team worked closely with Toronto’s hyperbaric staff and their building contractors to provide a very user friendly environment for patient care. The new installation includes the 6 ATA rated DL8 with BIBS and hood supplies in both locks, a hyperbaric toilet and sink in the Entrance Lock and Fink Engineering’s touch screen control system.
Return to Installations